Home > News Center > Industry News > Horn Sounding for Production - Sprinting to 2021 and Welcomi

Horn Sounding for Production - Sprinting to 2021 and Welcomi

Now nearly the end of 2021, ABZ blows the production horn!

Our goal: sprint to the end of 2021 perfectly!    

    


5 single/double-wire copper/aluminum (aluminum alloy) RBD with servo motors, 2 sets of 630 direct connected RFS without air-coupling with separate motors, 400/1+6 and 500/1+9 high-speed tubular standers with separate motors, several full-automatic double-reel take-up and coiler, annealing ...... Dozens of equipment are in production and assembly, on-line testing to ensure the delivery time before the New Year with high-quality.        

     
      
      

  
High-end 1250/1+4 laying-up machine was shipped smoothly, and many sets of equipment were installed and commissioned.


    
 

630/12+18+24directly connected RFS with separate motors are being commissioned and inspected through video by customer.
 

    

 

The horn is sounding, and ABZ people are eager to fight ~ sprint!
2022 is approaching ~ Let’s struggle!


    
 

ABZ

borfor China's fine manufacturing!

Create the future together with you!